Hacer Group Pty Ltd's cover image

This profile has not been claimed by the business owner or representative.

to update business information, get appointment requests, engage visitors with web chat, and more!

Hacer Group Pty Ltd

3.1

About this business

Location details

222 High St, Mahomet, IL, 3101, Australia

Get directions
WeekdayScheduleStatus
Mon8:00 a.m. to 5:00 p.m.
Tue8:00 a.m. to 5:00 p.m.
Wed8:00 a.m. to 5:00 p.m.
Thu8:00 a.m. to 5:00 p.m.
Fri8:00 a.m. to 5:00 p.m.
SatClosed
SunClosed
3.135 reviews
Select a rating
Elizabeth Hungerford Morgan's profile image
Elizabeth Hungerford Morgan 
a month ago
Rachael Michelle Ogle's profile image
Rachael Michelle Ogle 
a month ago

A complete lack of regard for local residents. I have lived near construction before, the Hacer team are the worst I have ever experienced. Work is meant to commence at 7 am, but every day it gets earlier and earlier. I have consistently put up with noise from as early as 6:10am. They leave trucks idle, and proceed to have a loud unnecessary conversations over the noise. Double brick, double glazing and earplugs aren’t enough to drain out the drivel and laughter from these inconsiderate brutes. A 7 am start 6 days a week is ... read more

Marty Graham's profile image
Marty Graham 
4 months ago

I worked with Hacer Group on a number of projects during my time as an architect and was consistently impressed by their professionalism and attention to detail. Their team always demonstrated a strong commitment to achieving the best possible outcome for everyone involved in the project. What stood out most was their collaborative approach and willingness to work constructively with consultants, clients, and contractors to resolve issues and maintain quality throughout the build process. Based on my experiences working with... read more

Shannon Foulis's profile image
Shannon Foulis 
6 months ago

I bought an apartment completed by Hacer Group in 2021. Quite a few QA issues that were either left as an afterthought and forgotten, or were a result of sub-par craftsmanship. 1. Bathroom shower drain was filled with grout, leading to minor flooding of the bathroom on day 1. When a trade came in to rectify this as part of warranty, they added a new chip to the tiles that was never rectified. 2. Bathroom floor tiles do not fall towards the central floor waste, which only contributed to the above flooding. 3. Bathroom door la... read more

joe Ross's profile image
joe Ross 
10 months ago

Please turn off the floodlights at night time on queens lane. Like far out. It’s pretty much daytime 24/7 with those things on. Shocking lack of regard for residents 

Frequently asked questions about Hacer Group Pty Ltd

How is Hacer Group Pty Ltd rated?

Hacer Group Pty Ltd has a 3.1 star rating with 35 reviews. 

When is Hacer Group Pty Ltd open?

Hacer Group Pty Ltd is closed now. It will open tomorrow at 8:00 a.m. 

Need help? Contact us.

Speak with a specialist to learn how you can grow with Birdeye. We are reachable at profiles@birdeye.com